Original Plans
Elevation Drawing
Floor plan
Site Plan for the lot
The Builder
Richmond American Homes
The Pictures
Landscaping Pictures
Picture #1
Picture #2
Picture #3
Picture #4
Picture #5
Picture #6
Picture #7
Picture #8
Picture #9
Picture #10
Picture #11
Picture #12
Picture #13
Picture #14
Picture #15
Picture #16
Extras
Picture #1 - Basement construction
begins.
Picture #2 - The 1st bench is in.
Picture #3 - The Grill.
March 19, 2000 (The Final Pictures)
Picture #1 - The House with landscaping.
Picture #2 - The House.
Picture #3 - From the side.
Picture #4 - The Neighborhood
Picture #5 - From the back.
Picture #6 - The back.
Picture #7 - The left side.
Picture #8 - The family room.
Picture #9 - The family room.
Picture #10 - The family room,
another view.
Picture #11 - The kitchen - refrigerator.
Picture #12 - The desk.
Picture #13 - The nook.
Picture #14 - The kitchen.
Picture #15 - The kitchen.
Picture #16 - The living room.
Picture #17 - The living room.
Picture #18 - The dining room.
Picture #19 - The study.
Picture #20 - Stuart.
Picture #21 - The study
Picture #22 - The stairs.
Picture #23 - The powder bath.
Picture #24 - The entry area.
Picture #25 - The basement work
area.
Picture #26 - The bathroom rough-in
almost removed.
Picture #27 - The freezer.
Picture #28 - Litter box row.
Picture #29 - The guest bedroom.
Picture #30 - The guest bedroom.
Picture #31 - Wanda's Office.
Picture #32 - The hall bathroom.
Picture #33 - Jim's Office.
Picture #34 - The utilitiy room.
Picture #35 - The master bedroom.
Picture #36 - The master bedroom.
January 8, 2000:
Picture #1 - The family room, carpet
installed, waiting final shelves and stain.
Picture #2 - The kitchen, appliances
installed, hood fan won't last a day.
Picture #3 - The desk is finished.
Picture #4 - The master bath sinks
finished, mirrors installed.
Picture #5 - The master closet
complete.
Picture #6 - The master bath shower
complete. Note the soap dish has been changed.
Picture #7 - The hall bath complete
with mirrors. Yes the hole is fixed, the medicine cabinet is waiting
install.
Picture #8 - The entry hall light
installed.
January 2, 2000:
Picture #1 - The kitchen, counter tops
completed, sink installed.
Picture #2 - Another view of the
kitchen.
Picture #3 - The desk in the nook
complete.
Picture #4 - The family room.
Picture #5 - The dining room with
fixture.
Picture #6 - The bookcase in the
study.
Picture #7 - The stairs.
Picture #8 - The hall bath with
counter tops complete and fixtures installed.
Picture #9 - The tub tile complete.
Picture #10 - The hall bath light
fixture, the hole is still not fixed.
Picture #11 - The utility room
floor installed.
Picture #12 - The master bath counter
top and sinks.
Picture #13 - The master bath shower
and tub.
Picture #14 - The master bath.
Picture #15 - The wood floor stained
in the entry.
Picture #16 - The wood floor in
the kitchen.
December 26, 1999:
Picture #1 - The kitchen with cabinets
installed.
Picture #2 - The center island
prepared for tile.
Picture #3 - The cabinet and counter
top installed in the hall bathroom.
Picture #4 - The tile installed
around the tub in the hall bathroom.
Picture #5 - The completed counter
top waiting for the hole to be fixed.
Picture #6 - The tile installed
in the master bathroom.
Picture #7 - The master bath cabinet
installed waiting for tile.
December 19, 1999:
Picture #1 - The Family Room, fireplace
is complete.
Picture #2 - The garage door, the
only door still hanging right now.
Picture #3 - The pantry with shelves
installed.
Picture #4 - The dinning room bay
window.
Picture #5 - Closet door in one
of the upstairs bedrooms.
Picture #6 - The master closet
with shelves installed.
Picture #7 - The hall bath, getting
ready to install the medicine cabinet. And we even pointed out the
problem with the pipe.
Picture #8 - The stairs complete.
December 11, 1999:
Picture #1 - The family room with brick
complete.
Picture #2 - The wood floor in
the kitchen.
Picture #3 - The wood floor in
the kitchen and entry.
Picture #4 - The wood floor in
the garage entrance and kitchen.
Picture #5 - The wood floor in
the main entrance with a view of the study.
Picture #6 - A view of the upstairs.
Picture #7 - The next 4 are pictures
of the front of the house with shutters installed.
Picture #8 - I took 4 of these
because of the position of the sun.
Picture #9 - The lighting was not
that great.
Picture #10 - Ditto.
November 20, 1999:
Picture #1 - The family room.
Picture #2 - The living room.
Picture #3 - The kitchen.
Picture #4 - The main entrance
and the study.
Picture #5 - The master bathroom,
note: lots of green board here.
Picture #6 - The upstairs hallway.
Picture #7 - Wanda's office.
Picture #8 - The utility room.
Picture #9 - The master bedroom.
Picture #10 - The spare bedroom.
Picture #11 - The main entrance
as seen from upstairs.
Picture #12 - The main stairs.
November 14, 1999:
Picture #1 - The front of the house,
note the copper roofs have been installed, painting is complete.
Picture #2 - A further back view
of the house.
Picture #3 - The garage, insulation
installed.
Picture #4 - The front of the house.
The front steps are formed.
Picture #5 - The insulation in
the family room.
Picture #6 - The fireplace is installed,
I know, it's a little blurry.
Picture #7 - The garage wall insulation.
Picture #8 - The living room insulation.
Picture #9 - The back wall of the
kitchen.
Picture #10 - The garage wall in
the study.
October 5, 1999:
Picture #1 - The Roof work continues.
The brick is complete, note the windows.
Picture #2 - Another view.
Picture #3 - The bathtub and plumbing
installed, note they did put the correct color in.
Picture #4 - The laundry room plumbing
installed.
Picture #5 - Master bath plumbing
installed.
Picture #6 - Close up view of the
front.
Picture #7 - Close up view of the
garage.
October 4, 1999:
Picture #1 - The work on the roof has
begun.
Picture #2 - The houses next door
are starting to take shape.
Picture #3 - Another view.
Exterior brick, Interior Plumbing
Picture #1 - The house with brick complete.
Picture #2 - 2nd picture with brick
complete.
Picture #3 - A close up of the front.
Picture #4 - The garage.
Picture #5 - The view from the garage
looking inside.
Picture #6 - The view of the family
room from the kitchen.
Picture #7 - The view of the dining
room.
Picture #8 - The view go upstairs towards
the master bedroom.
Picture #9 - The master bathroom with
tub and shower frames installed.
Picture #10 - The view of the entry
area and the guest bedroom.
Picture #11 - The view of office #2
from the guest bedroom.
Picture #12 - The view of office #1.
Picture #13 - The view of the entry
area.
Picture #14 - A close-up view in the
family room.
Picture #15 - A view of the back of the
house from Sicily Street.
The frame
Picture #1 - The back filled foundation
awaiting the next step.
Picture #2 - The completed basement
floor.
Picture #3 - The completed basement
floor and crawl space.
Picture #4 - The start of the frame,
1st floor sub floor is installed.
Picture #5 - A close up of the 1st floor
sub floor installation.
Picture #6 - A view of the 1st floor
sub floor, the wall layout has begun.
Picture #7 - The 1st floor framing has
begun.
Picture #8 - 1st Floor - The dining
room bay window.
Picture #9 - 1st Floor - A view from
the kitchen into the family room.
Picture #10 - 1st Floor - The study.
Picture # 11- 1st Floor - The view
from the bay window in the study.
Picture #12 - 1st Floor - A view from
the family room into the kitchen.
Picture #13 - 1st Floor is almost complete.
Picture #14 - 2nd Floor is started.
Picture #15 - 2nd Floor work continues.
Picture #16 - 2nd Floor is complete,
roof sections are ready in front.
Picture #17 - The Roof is on.
Picture #18 - The outside framing and
roof is complete.
Picture #19 - The garage floor is in.
Picture #20 - The left side, note the
slab for the side garage door is complete.
Picture #21 - The front entrance, no
stairs yet.
Picture #22 - The view upstairs.
Picture #23 - The view upstairs, office
#1 and master bedroom.
Picture #24 - The dinning room, the
windows are not cut out in the bay window yet.
Picture #25 - The family room and kitchen,
the windows await installation.
Picture #26 - The back of the house.
Picture #27 - The right side as seen
from the back, see the school?
Picture #28 - The backyard.
foundation Construction
Picture #1 - The foundation Formed.
Picture #2 - foundation forms, side
view.
Picture #3 - The formed foundation,
close up.
Picture #4 - The foundation after
the forms were removed.
Picture #5 - The foundation, side
view.
Picture #6 - The steel floor installed.
Picture #7 - The crawl space &
basement.
Picture #8 - The foundation, back
view.
Picture #9 - The steel floor, close
up.
Picture #10 - The completed foundation,
prior to back fill.
The Neighborhood
Picture #1 - The James model and sales
office at the entrance.
Picture #2 - The view from the end
of the street 5/6/99.
Picture #3 - The view from the end
of the street 6/16/99.
Picture #4 - The view from the end of
the street 7/7/99.
Picture #5 - The view from the end of
the street 7/22/99.
Picture #6 - The view from the end of
the street 8/3/99.
Picture #7 - The view from the end of
the street 8/8/99.
Picture #8 - The view from the end of
the street 8/22/99.
Picture #9 - The view from the end of
the street 10/3/99.
Picture #10 - The houses behind ours.
Picture #11 - The houses next door.
Picture #12 - The view of the block.
Picture #13 - The houses on the street
behind ours.
Picture #14 - The first house that
was completed.
Picture #15 - A new picture of the model.
The DIG Begins....
Picture #1 - The lot prior to stake. Note the
address sign.
Picture #2 - The lot is staked. I know,
it's a little dark.
Picture #3 - The dig begins....We were
lucky enough to be out there as it began.
Picture #4 - The dig is complete, the window
wells are delivered.
Picture #5 - The foundation steel is installed,
waiting for forms.
The lot
Picture #1 - The view from the front of the
lot.
Picture #2 - The right side of the lot
(Could not fit it all in).
Picture #3 - A center view of the lot.
Picture #4 - The left side of the lot (Could
not fit it all in).

Last Updated on October 18, 2006